Plan to demolish run-down industrial buildings in West Midlands village

The existing structures have stood vacant for some time and are described as being in “a clear state of disrepair,” with concerns raised about asbestos.

Two run-down commercial buildings could be demolished to make way for a modern replacement.

A planning application proposes the demolition and replacement of the buildings at Mill Pool Farm Industrial Estate in Main Road, Hallow, with a new commercial unit.

The existing structures have stood vacant for some time and are described as being in “a clear state of disrepair,” with concerns raised about asbestos.

Hallow Industrial Estate Buildingplaceholder image
Hallow Industrial Estate Building | LDR

In a planning statement submitted to Malvern Hills District Council, Greenaway Planning Ltd said: “They are not considered suitable for continued use without substantial repair.

“In addition, it is understood that the buildings contain asbestos, which presents constraints in respect of health and safety and further supports the proposed replacement.”

The application also notes the site’s established industrial setting, which includes an existing cluster of commercial buildings.

The new building would be similar in height and design to the current structures, using matching cladding to ensure it fits into the surrounding estate.

The scheme includes the addition of four new car parking spaces to improve on-site parking provision and traffic movement, the plans state.

Inside Hallow Industrial Estate Buildingplaceholder image
Inside Hallow Industrial Estate Building | LDR

There is a public footpath (HT-530) nearby, but the application states that this will not be affected and will remain fully accessible.

Planning documents confirm the site is outside Hallow’s defined development boundary but within a designated “principal settled farmlands” area under green infrastructure policy.

No listed buildings or conservation areas are nearby, and the site falls outside the Malvern Hills National Landscape, according to the planning documents.

The buildings are not considered to pose drainage or flooding risks, with the proposal falling within Flood Zone 1 and surface water mapping showing low risk in the wider area.

The planning statement concludes that the new building would: “improve its overall quality and functionality, and support the long-term viability of the existing rural enterprise.”

The applicant argues that the scheme is “sustainable development” that replaces deteriorating, vacant buildings with a safer, purpose-built commercial unit.

Comment Guidelines

Iconic Media encourages reader discussion on our stories. User feedback, insights and back-and-forth exchanges add a rich layer of context to reporting. Please review our Community Guidelines before commenting.

Local news you can trust
Follow us
© 2026 Iconic Media Group Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice